The purpose of this activity is to review the results of Phase 5 with Data Resource Management, Project Management, Data Communications Administration, and Software Engineering. The meeting is conducted by Data Base Administration.
OVERVIEW
This is mainly a technical review in which the DBA
presents the APDBM design. The main points to be considered
are:
After this activity, Software Engineering may proceed with
the programming phases of system development (ISEM Phases 4-II,
5 and 6).
Data Base Administration should be extremely well prepared.
Visual aids should be used to explain and clarify findings.
Copies of the Phase 5 "APDBM Design Manual" should be
distributed to pertinent managers well in advance of the
review meeting. This allows the manager ample time to study
the report and prepare for the meeting.
The intent of the review meeting is not necessarily to
explain each section of the report, but to answer questions and
summarize the conclusions. The report, thereby, is the focal
point of the meeting.
During the review meeting, decisions or discussions may
have indicated a project change or revision. Data Base
Administration modifies the report as required and establishes
another review meeting (if necessary) to consider the revised
report.
A final and approved copy of the Phase 5 "APDBM Design
Manual," with the initials or signatures of management, is
sent to the Technical Library for filing in the project file.
STEPS IN EXECUTION
|