| PRIDE | ® | -ISEM |
| ||||||
This section contains the following:
Copyright © 1971-2005 by
M. Bryce & Associates
Palm Harbor, Florida, USA
All rights reserved.
The purpose of this activity is to review the results of Phase 2 with User Management, Information Resource Management, Systems Resource Management, and Data Resource Management. The review is used to determine whether the project should continued as proposed, revised or discontinued.
OVERVIEW
During Phase 2, Activity E, Project Management conducts a
phase review meeting to obtain the formal project decision from
management. Systems Engineering is in attendance to answer
any pertinent questions as they arise.
Management support and involvement is essential for project
success. A well prepared concise report gives management the
confidence necessary to make the appropriate project decisions.
Because of the importance of this review, Project Management and
Systems Engineering should be extremely well prepared. Visual
aids should be used to explain and clarify findings. Those in
attendance should have the authority to make decisions.
Copies of the Phase 2 "System Design Manual" should be
distributed to pertinent managers well in advance of the review
meeting. This allows the manager ample time to study the report
and prepare for the meeting.
The intent of the review meeting is not necessarily to
explain each section of the report, but to answer questions and
summarize the conclusions. The report, thereby, is the focal
point of the meeting.
As in Phase 1, there are three possible outcomes from the
review meeting:
PROJECT APPROVED
Systems Engineering advises all meeting attendees of the
results of the meeting by memo or letter. The project continues
according to plan.
PROJECT DISAPPROVED
Systems Engineering discontinues all activity on the
project and prepares an audit report as indicated in Phase 9.
This will document the disposition of the project. All study
material is filed in a project file in the Technical Library for
future reference.
REVISE PROJECT
During the review meeting, decisions or discussions may
have indicated a project change or revision. Systems
Engineering reviews the project and estimates, modifies the
report and establishes another review meeting (if necessary)
to consider the revised report.
A final and approved copy of the Phase 2 "System Design
Manual," with the initials or signatures of management, is sent
to the Technical Library for filing in the project file.
STEPS IN EXECUTION
|