The purpose of this activity is to review the Order-of-Magnitude estimate/schedule as it pertains to this sub-system. This activity is also used to prepare the Phase 3 "Sub-System Design Manual" for review.
OVERVIEW
The fundamental difference between this activity and
Phase 2, Activity D, "Prepare Design Evaluation," is that
this activity is only concerned with evaluating a single
sub-system (while Phase 2 is used to evaluate the whole
system).
During the previous activities, Systems Engineering
finalized the sub-system design. As part of this process,
changes in the design will inevitably be encountered that were
not anticipated in prior phases. This is natural since the
design is more definitive. The refinements in the design may
effect the project estimate and schedule. Therefore, the intent
of this activity to re-evaluate them before proceeding.
During Phases 1 and 2, the following items were defined:
During Phase 3, Activity C, Project Management and Systems
Engineering checks the validity of each of these in lieu of the
finalized sub-system design.
As in Phase 2, Activity D, Software Engineering, and Data
Engineering will participate in the review of the OOM estimates.
PREPARING FOR REVIEW
Project Management and Systems Engineering assures that
all of the Phase 3 activities and materials have been properly
completed. A Phase Review Checklist is available for this
purpose. A formal Phase 3, "Sub-System Design Manual" is then
prepared. The manual is reviewed and checked by Quality
Assurance prior to distribution to management for review.
The Phase 3 Manual contains the following items: