PRIDE ® -ISEM
Information Systems Engineering Methodology
PHASE 5 - SOFTWARE MANUFACTURING
ACTIVITY E - PHASE 5 REVIEW

FUNCTIONAL MATRIX   CHECKLIST   SUPPORT   FORMS

TRANSLATE THIS PAGE TO... Chinese (simple)   Japanese       Dutch   French     German     Italian    
Free Translation courtesy of ALS      Chinese (traditional)   Korean       Portuguese       Russian       Spanish         

CONTENTS

This section contains the following:


 
    BUSINESS PURPOSE

    The purpose of this activity is to review the test results with the computer procedure designer to assure that all program/module objectives were met.  

    OVERVIEW

    After the program/module has been tested and all known errors corrected, Software Engineering reviews the program with the computer procedure designer, Project Management, and Systems Resource Management. They review the results of program testing and assure that the program meets specifications, both as to logic and environment.

    As a result of this phase, Software Engineering has produced an executable program documented by:

    1. Annotated source code listing or equivalent.

    2. Machine processable object code.

    3. Test input and output.
     

    STEPS IN EXECUTION

    1. Software Engineering reviews the results with the computer procedure designer, Project Management, and Systems Resource Management. The purpose of the review is to obtain agreement that the specifications have been met.

    2. Software Engineering files the program source listing accordingly. This can be accomplished either through a program librarian/documentation aid, or printed copies can be maintained in the Technical Library.

    3. Software Engineering closes the phase and forwards project documentation to the Technical Library for filing.

   


Copyright © 1971-2009 by M. Bryce & Associates
Palm Harbor, Florida, USA
All rights reserved.