Whereas Phase 4-I was used to write and test the
administrative procedures and Phase 6 was used to test the
computer procedure, the intent of the Phase 7 test is to walk
through the sub-system, from start to end. The Phase 3
Sub-System Design Manual, with its Test Criteria section,
thereby becomes the "roadmap" for the test.
Test data for the Phase 7 test should simulate 'live' or
actual data as closely as possible. As such, the test data
resulting from Phase 6 is used. More importantly, Phase 7 is
used to test input transaction volume, to assure that there is
not an adverse affect on processing speed.
After normal data is processed correctly, Systems
Engineering processes unusual or incorrect data to test for
proper handling and to check operating features such as
re-start, rerun, etc.