This activity tries to simulate live conditions.
In addition to verifying the processing of data, Systems
Engineering assures that there is a smooth flow of work
between people and equipment. Procedural "bottle-necks" are
identified and expedited.
Using the data prepared in Activity A, Systems Engineering
tests the sub-system for normal operation. All program errors
found are corrected by Software Engineering. Test data used in
Phases 5 and 6 should be revised to detect these errors.
Sub-system testing is considered complete when it can
handle all test data correctly and meets environmental operating
specifications.
In addition to Systems Engineering and Software
Engineering, Data Base Administration and DP Operations may
participate in the test.